Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the atomic-blocks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/kpcoyles/public_html/patcoyle/wp-includes/functions.php on line 6131
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the genesis domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home3/kpcoyles/public_html/patcoyle/wp-includes/functions.php on line 6131
Deprecated: Creation of dynamic property Advanced_Editor_Tools::$toolbar_classic_block is deprecated in /home3/kpcoyles/public_html/patcoyle/wp-content/plugins/tinymce-advanced/tinymce-advanced.php on line 347
Deprecated: Creation of dynamic property Advanced_Editor_Tools::$toolbar_block is deprecated in /home3/kpcoyles/public_html/patcoyle/wp-content/plugins/tinymce-advanced/tinymce-advanced.php on line 349
Deprecated: Creation of dynamic property Advanced_Editor_Tools::$toolbar_block_side is deprecated in /home3/kpcoyles/public_html/patcoyle/wp-content/plugins/tinymce-advanced/tinymce-advanced.php on line 350
Deprecated: Creation of dynamic property Advanced_Editor_Tools::$panels_block is deprecated in /home3/kpcoyles/public_html/patcoyle/wp-content/plugins/tinymce-advanced/tinymce-advanced.php on line 351
Deprecated: Creation of dynamic property Advanced_Editor_Tools::$used_block_buttons is deprecated in /home3/kpcoyles/public_html/patcoyle/wp-content/plugins/tinymce-advanced/tinymce-advanced.php on line 354 Great progress on trenching for El Llanito Nicaragua water supply
We’ve been very pleased at the progress on trenching for the water supply project. We are concerned that the rocky soil would make this very difficult work, and in places that is the case. However in other places the teams are doing really well and making rapid progress.
The water committee or (CAPS) has organized the work into 25 meter segments with assigned individual volunteers.
Hasta LOS ninos, esta trabajando!
There are some very rocky places, we’re having to detour around.
But overall, it has gone much quicker than anticipated. The community engagement and work is extraordinary.